Shaukat Khanum Hospital — Data Center UPS — OES project
UPS Systems Year: 2024

Shaukat Khanum Hospital — Data Center UPS

Shaukat Khanum Memorial Trust • Lahore

Project Case Study

About This Implementation

120KVA modular UPS system with N+1 redundancy for Shaukat Khanum hospital data center, guaranteeing 99.99% uptime.
Client Shaukat Khanum Memorial Trust
Location Lahore
Capacity / Scope 120KVA N+1
Completed Year 2024
Shaukat Khanum Hospital — Data Center UPS
Engineering Discipline: UPS Systems
Project Status: Fully Operational

More Featured Projects

Explore other successful deployments delivered by OES across industrial and banking sectors.

Faisalabad Textile Mill — 500KW Rooftop Solar Solar Systems

Faisalabad Textile Mill — 500KW Rooftop Solar

Gulshan Textile Ltd Faisalabad

Complete 500KW rooftop solar installation reducing grid dependency by 70%. System includes advanced monitoring and net metering registration.

Completed: 2024
Habib Bank Regional Office — 60KVA UPS UPS Systems

Habib Bank Regional Office — 60KVA UPS

HBL Karachi

Mission-critical 60KVA online UPS with 8-hour battery backup ensuring zero downtime for Habib Bank regional operations.

Completed: 2024
MCB Bank Branch Network — 45 Counting Machines Counting Machines

MCB Bank Branch Network — 45 Counting Machines

MCB Bank Ltd Nationwide

Supply, installation, and calibration of 45 SNBC banknote counters across the MCB branch network. Includes staff training.

Completed: 2023

Have a Mission-Critical Project?

Our certified engineers across Karachi, Lahore, Islamabad, KPK, and Quetta are ready to assess your technical requirements.