OES — Office Equipment System Logo
Lotte Chemical — UPS Battery Upgrade — OES project
Battery Storage Year: 2022

Lotte Chemical — UPS Battery Upgrade

Lotte Chemical Pakistan Ltd • Karachi

Project Case Study

About This Implementation

Complete battery bank replacement and capacity upgrade for Lotte Chemical plant, extending backup runtime to 6 hours.
Client Lotte Chemical Pakistan Ltd
Location Karachi
Capacity / Scope 6 Hours Runtime
Completed Year 2022
Lotte Chemical — UPS Battery Upgrade
Engineering Discipline: Battery Storage
Project Status: Fully Operational

More Featured Projects

Explore other successful deployments delivered by OES across industrial and banking sectors.

Faisalabad Textile Mill — 500KW Rooftop Solar Solar Systems

Faisalabad Textile Mill — 500KW Rooftop Solar

Gulshan Textile Ltd Faisalabad

Complete 500KW rooftop solar installation reducing grid dependency by 70%. System includes advanced monitoring and net metering registration.

Completed: 2024
Habib Bank Regional Office — 60KVA UPS UPS Systems

Habib Bank Regional Office — 60KVA UPS

HBL Karachi

Mission-critical 60KVA online UPS with 8-hour battery backup ensuring zero downtime for Habib Bank regional operations.

Completed: 2024
MCB Bank Branch Network — 45 Counting Machines Counting Machines

MCB Bank Branch Network — 45 Counting Machines

MCB Bank Ltd Nationwide

Supply, installation, and calibration of 45 SNBC banknote counters across the MCB branch network. Includes staff training.

Completed: 2023

Have a Mission-Critical Project?

Our certified engineers across Karachi, Lahore, Islamabad, KPK, and Quetta are ready to assess your technical requirements.